波音游戏-波音娱乐城赌球打不开

Network Support for Remote Offices

by Dick Wong

 

Due to a shortage of space, the university is exploring various ways to accommodate new staff and academic programmes. One way of tackling this problem is to adopt a “core-satellite” approach. The “core” represents premises in the Kowloon Tong main campus while “satellite” refers to remote offices and learning centres outside of the main campus. As the number of remote offices and learning centres rises, CityU staff and students are now spread across a wide geographical area in Hong Kong (see map below).

 

As shown in the table below, these remote offices of varying sizes (indicated by the no. of computer outlets) have been around since 2008 and the total bandwidth allocated was normally determined by the number of users or computer outlets installed. But in some cases, departments may recommend the bandwidth themselves due to special needs.

More often than not, the Computing Services Centre (CSC) needs to rely on the Internet Service Provider (ISP) to provide the WAN links from the remote offices to the CityU’s main campus and the rental cost in general is proportional to the bandwidth subscribed. However, in the case of Festival Walk, the CSC had laid its own optical fibre cable between the CSC’s Computer Room and Festival Walk offices, consequently, the CSC was able to offer a higher bandwidth for Festival Walk than other remote offices without paying ISP any rental cost.

 

Remote campus location

Usage

Bandwidth

Computer Outlet

Installation Date

Chak On Market, Sham Shui Po

Staff office

20 Mbps

50

1-Jun-08

Festival Wallk, Kowloon Tong

Staff office

20 Gbps

500

2001

GrandTech, Shatin

Staff office

100 Mbps

20

25-Jul-08

InnoCentre, Kowloon Tong

Staff office

100 Mbps

400

1-May-08

Science Park, Tai Po

Staff office

1 Gbps

300

1-Feb-10

Ka Chi School, Shek Kip Mei

Staff office & learning centres

20 Mbps

60

15-Dec-08

ChinaChem Golden Plaza, TST

Staff office & learning centres

100 Mbps

300

1-Sep-10

Telford Annex, Kowloon Bay

Staff office & learning centres

100 Mbps

-

-

United Centre, Admiralty

Staff office & learning centres

20 Mbps

30

1-Oct-09

Every network, no matter how small, requires care in architecture, security, failover, and performance planning. One poorly designed and unmanaged remote campus can bring everyone down. In fact, the entire network team of the CSC will be involved in the following three stages when setting up a new network for remote offices:

  • IT planning: work with CDFO to identify IT needs and respective procurement for remote offices including planning, budgeting, design, tender, contract administration, site supervision and coordination
  • Project Implementation: monitor the progress of the structured cabling system installation and networking equipment installation including configuration, implementation, testing and acceptance of the network system
  • Ongoing support: supervise the cabling work as requested by departments and monitor the network status 24x7 to ensure the remote IT infrastructure is working properly at all times

Furthermore, as a service provider, the CSC will ensure that both staff and students can enjoy the following set of network services as those on the main campus which include:

  • Internet Service
  • File & Print Service
  • Video Service
  • IP Phone Service
  • Wireless LAN Service

Moving Forward

As set out in the IT Strategic Plan 2010-2015, the CSC will plan to strengthen and extend its support by establishing a common set of standardized network services and their corresponding service levels so that staff and students at remote offices and remote campuses can enjoy comparable, if not the same, quality of services. In particular, with more and more mobile devices and video services on the campus network, in order to achieve agility in network provisionings cost-effectively, the CSC will need to employ new technology to extend network services seamlessly to remote locations and to reduce latency during data transfer as well as to monitor and manage IT infrastructure remotely. In addition, the CSC plans to outsource on-site support to service providers whenever it is cost-effective to do so and will ensure adequate trainings be provided to local support staff at remote offices so as to reduce the support effort required from main campus to a minimum.

 

乐九线上娱乐| 澳门顶级赌场百家乐| 百家乐路单免费下载| 六合彩图片| 百家乐官网对付抽水| 欧洲百家乐的玩法技巧和规则| 高安市| 赌场百家乐作弊| 真人百家乐官网新开户送彩金| 机械百家乐技巧| 金盾百家乐官网网址| 德州扑克3d豪华版| 大杀器百家乐官网学院| 顶级赌场 足彩分析| 扑克百家乐官网麻将筹码防伪| 百家乐怎样赢| 澳门百家乐网上娱乐场开户注册| 百家乐官网赌场占多大概率| 新锦江百家乐的玩法技巧和规则| 百家乐官网论坛官网| 新全讯网网站112| 百家乐是骗人吗| 百家乐官网赌博是否违法| 大庆冠通棋牌下载| 网络百家乐公式打法| 百家乐官网平7s88| 利记娱乐| 大连百家乐食品| 百家乐二号博彩正网| 百家乐官网投注最好方法| 百家乐官网公试打法| 德州扑克英语| 盈得利百家乐娱乐城| 雅加达百家乐官网的玩法技巧和规则 | 淘宝博百家乐官网的玩法技巧和规则 | 百家乐官网什么叫缆| 大发888官方hgx2dafa888gwd| 百家乐1326投注| 七胜百家乐官网娱乐| 百家乐官网是如何骗人的| 大发888代理充值|