Deploying High Density Rack Power to Support High Performance Computing in CityU

by Manfred Chan


City University of Hong Kong (hereafter CityU) aspires to become a leading global university, excelling in research and professional education. To address the growing needs arising from our strategic interdisciplinary research areas as laid out in our Strategic Plan 2020–2025, the Computing Services Centre (CSC) had built a centralised High Performance Computing (HPC) system (named CityU Burgundy) to provide state-of-the-art capability in computationally intensive research areas. It was first introduced in September 2021. Researchers from various disciplines had heavily used the HPC resources since the launch of the facility. In fact, some researchers had even decided to contribute their research funding to further expand the capability of the CityU Burgundy. 

The HPC IT workloads that spanned across eight racks with a power consumption of 15kW each (a total of 120kW) were protected by a 200kW Uninterruptible Power Supply (UPS) System. Along with the proliferation of compute-intensive workloads, the rack power requirements have also gone up.  In order to fully utilize the precious University Space, the CSC has deployed high-density racks that can support 50kW IT workloads per rack to replace the existing ones. The new high-power racks can support more powerful servers that provide the overall theoretical peak performance up to 1.7PFLOPS.

HighDensityRacks-1.png
?The layout of high-density racks for hosting HPC servers

High-density racks are not common. High power consumption will generate a lot of heat energy and in turn, requires stable cooling facilities. To the best of our knowledge, CityU is the first institution in Hong Kong to build a data centre with 50kW power per rack. The rack was designed to provide electric power with two power feeds, one from Normal and the other from UPS. There are sufficient intelligent PDUs to give the redundancy power supply to each compute HPC node. Each 50kW cabinet is equipped with an internal fire compression unit to protect the whole data centre even if there is a fire incident inside the high-density 50kW rack. The power consumption of each power outlet can be monitored remotely via the management network by the Data Centre Infrastructure Management (DCIM) system. The Operations team in the Network Operations Centre can monitor the system status and receive alerts if there is over-usage on the power consumption.

This is just the beginning. The CSC will continue to optimise its high-density data centre for HPC processing-intensive applications.  The key is to evaluate the current infrastructure from time to time and understand which technology will work best for them.

 

网页百家乐游戏| 百家乐翻天粤| 百家乐官网l23| 百家乐官网赢的方法| 大发888博彩网站xa11| 亚洲百家乐官网的玩法技巧和规则 | 立博官网| 云鼎百家乐官网的玩法技巧和规则 | 百家乐官网六合彩| 大发888大发888娱乐游戏| 女优百家乐官网的玩法技巧和规则| 红河县| 同乐城百家乐娱乐城| 澳门百家乐出千| 百家乐官网象棋玩法| 尊龙国际在线娱乐场| 百家乐真人赌场娱乐网规则| 百家乐官网网站排名| 永利百家乐官网游戏| 大发888有哪些| 24山天机申山寅向择日| 澳门百家乐官网玩法与游戏规则| bet365百家乐| 速博百家乐的玩法技巧和规则 | 17pk棋牌官方下载| 威尼斯人娱乐棋牌| 北京百家乐网上投注| 大发888游戏平台888| 百家乐等投注网改单| 百家乐打印程序| 百家乐官网赢钱秘籍鹰| 澳门百家乐官网路子分析| 总统线上娱乐城| 老虎机技巧| 迷你百家乐的玩法技巧和规则| 新思维百家乐投注法| 百家乐高手qq| 苹果百家乐官网的玩法技巧和规则 | 玩百家乐澳门368娱乐城| 24山运| 百家乐官网园蒙特卡罗|