Water pH Neutralization Plant


Neutralization Plant


Description
All the sinks and floor drains in the lab areas on Floors 1, 2 and 4 of Yeung Kin Man Academic Building are connected by piping down to the Neutralization Plant, which is installed on the basement of the same building. The liquid waste is piped into one of the two fibre glass storage tanks (12m3 litres capacity each) alternatively. A water level controller inside each of the tanks controls the inlet motorized valve's open and close action, which in turn controls the liquid waste feeding into the tank. At any one time, only one tank will accept liquid waste. When a tank is filled up, its' inlet motorized valve will be closed and its' pH control stage will start. Meanwhile, the inlet motorized valve of the other tank will be open to accept wastewater.

Depending on the pH level of the wastewater, either sulphuric acid or sodium hydroxide will be dosed into the fibre glass storage tank by chemical dosing pumps, until the pH value reached the pre-set value of the 6.2~7.9 on the pH controller. The dosing of the chemicals is entirely automatic and controlled by a micro-processor controller. An agitator installed inside the tank is used for mixing the wastewater with the dosing chemicals. The chemical dosing system includes the pH level sensors installed inside the storage tanks, pH controller in the control panel, chemical dosing pumps, chemical storage tanks and feed pipes. All these are housed inside the neutralization plant room.

After the pH value is settled steadily at the pre-set value of 6.2~7.9, the neutralized wastewater will be discharged into the sewer by effluent pumps.

A sump pit with two submersible pumps has been provided inside the plant room to collect any water and/or chemicals overflow from the storage tanks, cleaning of floor and equipment; etc. The wastewater so collected will be fed into the storage tanks for neutralization before discharging to public sewer.

In cases when the Neutralization Plant is broken down due to either equipment failure, lack of dosing chemicals for neutralization purposes, piping leakage, etc., discharge of any wastewater into the system at very short notice.
 
Location
Basement of SC68, Yeung Kin Man Academic Building
 
Notes
Due to safety reasons, site visit can be arranged by advance booking.
 
Enquiry
Mr. Hardy Wong (CDO)
Tel: 3442 6791
Email : hardy.wong@cityu.edu.hk
 
Virtual Help Desk X
武汉百家乐官网庄闲和| 百家乐群必胜打朽法| 乐天百家乐的玩法技巧和规则| 百家乐官网平台| 大发888博彩网站| 百家乐视频打麻将| 百家乐官网压钱技巧| 百家乐正规站| 八大胜百家乐官网的玩法技巧和规则| 百家乐官网赢新全讯网| 百家乐官网筹码防伪套装| 百家乐在线洗码| 百家乐官网换人| 中华百家乐的玩法技巧和规则| bet365高尔夫娱乐场| 百家乐官网多少钱| 尊龙娱乐| 百家乐发牌靴遥控| 百家乐官网软件辅助器| 太阳城在线娱乐| 百家乐官网看大路| 百家乐官网电投网址| 皇冠网上投注网| 娱网棋牌下载| 玩百家乐优博娱乐城| 湘乡市| 全讯网新| 邯郸百家乐园怎么样| 百家乐官网赌博详解| 爱拼百家乐官网现金网| 凯时娱乐城官网| 大发888官网 平台| 网络百家乐真人游戏| 百家乐官网必知技巧| 百家乐官网3宜3忌| 现金网hg8568.com| 新花园百家乐的玩法技巧和规则| 阿图什市| 德州扑克游戏| 威尼斯人娱乐城老品牌值得您信赖lm0 | 百家乐辅助分析软件|