The Progress of the Network Upgrade

by Dick Wong

As mentioned in the previous article on Campus Network Upgrade ( Ref: Network Computing Issue 54 - December 2007 ), the University’s campus network is currently undergoing a major upgrade, from CTNET III to CTNET IV. The network upgrade consists of 2 phases. Phase 1 of the network upgrade was successfully completed in September 2007. In this phase, the old Gigabit network core was upgraded to a new 10 Gigabit network core with all the Gigabit Ethernet connections between the core and distribution layer switches replaced by 10 Gigabit Ethernet links. The switching power of each switch in the network core was also upgraded from 128 Gbps to 720 Gbps. Apart from bandwidth upgrade for meeting the increasing network demand, the new network core will provide the advanced network features that is indispensible in modern network infrastructure. They include enhanced QoS, Flex Link, Scavenger Traffic Control, Native IPv6 support in hardware, Network Virtualization, etc, In order to set up the proper function of the network core and to verify the upgrade works according to design, over 2,000 access switch ports in some wiring closets were selected to be upgraded from 10/100 Mbps to 10/100/1000 Mbps for end-user connections.

Phase 2 of the network upgrade has just been started in April 2008. Another 7,000 access switch ports in the remaining wiring closets will be upgraded to 10/100/1000 Mbps in this phase. The scope of the work in this phase is so huge that nearly all the departments in every building will be involved. In order to minimize the impact on users, the Computing Services Centre (CSC) has arranged all the tasks that require a partial network shutdown to be performed at weekends. The CSC appreciates departments’ cooperation and apologizes for any inconvenience the upgrade may cause. If everything goes smoothly, this phase would be finished by the end of June 2008. After that, all network connections provided by the CSC will be able to support up to 1 Gbps. We are confident that, with the dedication and the experience of the CSC staff, our network infrastructure will become one of the most advanced and reliable ones among all universities in the world.

Some facts and figures for the 2-year Campus Network Upgrade Project include:

  • 14 Cisco 6509E Chassis with sup720 in the core
  • 56 10 Gigabit Ethernet ports in the core
  • 200 1 Gigabit Ethernet ports in the core
  • 36 Cisco 3750 access switch with 1Gbps redundant uplinks
  • 20 Cisco 6504E (sup32) access switch with 1Gbps redundant uplinks
  • 11 Cisco 6506E (sup32) access switch with 1Gbps redundant uplinks
  • 10 Cisco 6506E (sup32) access switch with 10Gbps redundant uplinks
  • 9 Cisco 6509E (sup32) access switch with 10Gbps redundant uplinks
  • 9000 10/100/1000Mbps Ethernet switch ports installed
  • 80 wiring closets
百家乐套路| 百合百家乐官网的玩法技巧和规则| 百家乐官网网开服表| 现金网注册送彩金| 百家乐大娱乐场开户注册| 海王星开户| 诸子百家乐官网的玩法技巧和规则| 大发888线上娱乐百家乐| 百家乐游戏排行榜| 百家乐官网平注法到65688| 波克棋牌官方免费下载| 神话百家乐官网的玩法技巧和规则 | 真人百家乐ea平台| 新时代百家乐官网的玩法技巧和规则| bet365注册 jxhymp| 大发888新老虎机| 全讯网3344555| 大发888怎么样| 香港六合彩开奖结果网| 百家乐光纤冼牌机| 大发888娱乐城注册送筹码| 大发888dafa8668| 新澳门娱乐城官网| 澳门体育博彩| 百家乐官网技巧看路| 网上百家乐官网赌博网| 足球系统出租| 百家乐官网如何破解| 博网百家乐官网现金网| 澳门百家乐官网的公式| 百家乐官网博彩通| 百家乐官网五湖四海赌场娱乐网规则 | 原平市| 在线百家乐官网有些一| 电脑赌百家乐官网可靠吗| 运城百家乐官网蓝盾| 百家乐l路单| 百家乐打法内容介绍| 百家乐园百利宫娱乐城信誉好...| 百家乐官网大轮转| 24山之巽山乾向水法及兼家分针|